Blog 6 - Cameron Restivo
Lane Regional Medical Center in Zachary has become the main focus point as of the recent weeks. We are quickly moving along as we have finished the irrigation work and around 80% of the bed prep. We have begun planting some of the areas but have had to wait on the more complicated areas and the ones along the building. The goal is to have the site planted by the end of next week.
Alongside Lane Regional Medical Center, we have started to push our two other large-scale projects past the conceptual planting and into a schematic planting plan. We are ahead of schedule on these two plans, but that is intended as we would like to acquire the maintenance for these sites after we finish building them, so we're making every effort to make sure these two project flow as smoothly as possible.
If you've been reading all of these blogs, the OLOL remodel that includes a chapel courtyard space, new front entry and two atriums in the main lobby has reached a little stand still. We received the architects final design for entry & exit locations, but they do not match the original plans we had received earlier. We expected changes, but the areas they said, "Remained the same" do not align with the previous drawings they sent us months ago. So, we are in the process of figuring that out and making sure our design is feasible with the current space we are allotted.
And last but not least:
Internship = S+ Tier
School = F- Tier
those dern architects 🤬
ReplyDelete#internship>school
ReplyDelete#F-isinsane
ReplyDelete